Call Message
EV Charging Installation

EV Charging Installation in Brisbane

Home and workplace EV charger installation — Tesla, Wallbox, ABB, BYD compatible.

Charge faster, charge safer. We install Type 2 and Tesla-compatible chargers at homes across Brisbane, including load-balancing setups that play nicely with your existing switchboard and solar. Apartment and workplace installs welcome.

What's included

  • Initial site visit and written quote — no surprises before work starts
  • Licensed and accredited technicians, fully insured and Master Electricians audited
  • Quality fittings sourced from major Australian suppliers — no cheap imports
  • Compliance certificate at job completion for your records and your insurer
  • Workmanship warranty on installation, plus manufacturer warranty on parts
  • Site left clean: drop sheets while we work, packaging removed, holes patched

Brisbane suburbs we serve

Morningside, Carina, Camp Hill, Coorparoo, New Farm, Hawthorne, Bulimba, Norman Park, Cannon Hill — and the wider inner-east Brisbane area for ongoing commercial clients.

Miranda Electrical EV Charging Installation in Brisbane

Common questions about EV Charging Installation

Which EV chargers do you install?

We install all major Type 2 wall chargers (Tesla, Wallbox, Schneider, Zappi, ABB, Ocular) and Type 2 tethered units. We're brand-agnostic — tell us your car and your daily charging pattern and we'll recommend a charger that matches. We don't push any one brand because every household setup is different.

Do I need a switchboard upgrade?

Sometimes — depends on the existing board, the available supply, and the charger's rated current. A 7kW single-phase home charger usually slots in fine; a 22kW three-phase charger often needs supply or board work. We check at the quote and tell you up front.

Can the charger work with my solar system?

Yes — load-balancing chargers (Zappi, OpenEVSE-style smart units) can prioritise solar generation when you're at home, then top up from the grid when the sun's down. If you have solar and want the lowest charging cost, ask about this when we quote — it's a small extra cost for a big efficiency gain.

How long does an install take?

A standard wall-mounted 7kW install on the side of a garage with the board nearby is around half a day. Longer cable runs, three-phase upgrades or apartment block installs take longer. We confirm the timeline in writing before booking.

Can you install for apartment buildings or strata?

Yes — we work with body corporates and building managers to plan multi-bay installs that share supply correctly. The board approval and metering side takes longer than the actual install, so factor that into your timeline. We can help with the strata paperwork.

What if I move house?

The charger is yours — it's wall-mounted but removable. We can remove it for you and reinstall at the new property, which is far cheaper than buying again. We also commonly disconnect/reinstall for clients who want to lease their previous home with the charger left in place.

Do EV charger installs include certification?

Yes. The install gets a Certificate of Electrical Safety, which is what your home insurer (and the manufacturer's warranty) will want to see. We register the charger with the manufacturer where required so warranty starts cleanly.